Home
Videos
Blogs
Contact Us
Links
Home
Videos
Blogs
Contact
Blogs Categories
LOKSEWA NEW VACANCY
CMAT EXAM PREPARATION AND LOKSEWA IQ NOTE
OUR DIGITAL VIDEO COURSE
NEB GRADE 11 / 12 NOTES
Banking Loksewa Questions
News Today
SHIKSHAK SEWA AAYOG QUESTIONS
HEALTH LOKSEWA QUESTIONS
11 ENTRANCE QUESTIONS
Civil Engineer PSC Exam Old Questions | Civil Engineer Loksewa Exam Old Questions
Civil Engineer PSC Exam Old Questions | Civil Engineer Loksewa Exam Old Questions
2 years ago
Civil Engineer PSC Exam Old Questions | Civil Engineer Loksewa Exam Old Questions
1. Shear modulus of elasticity is also known as
A) Modulus of elasticity
B) Bulk modulus of elasticity
C) Modulus of rigidity
D) Tangent modulus of elasticity
2. A piece of round steel forged in place to connect two or more steel members is known as a
A) Bolt
B) Rivet
C) Screw
D) Stud
3. The distance measured along one rivet from the centre of a rivet on it to the centre of the
adjoining rivet on the adjacent parallel rivet line, is known as
A) Staggered putch
B) Alternate pitch
C) Reeled pitch
D) Any one of these
4. Bending stress may develop in the case of
A) Lap joints
B) Single cover butt joints
C) Double cover butt joints
D) None of these
5. In an over-reinforced section
A) Steel reinforcement is not fully stressef to its permissible value
B) Concrete is not fully stressed to its permissible value
C) Either (a) and (b)
D) both (a) and (b)
6. The spacing of vertical stirrups in a rectangular beam is
A) maximum near the supports
B) minimum near the support
C) maximum near the center
D) minimum near the center
8. A doubly reinforced section is used
A) When the members are subjected to altermate external loads and the bending moment in the
sections reverse
B) When the members are subjected to loading eccentric on either side of the axis
C) When the members are subjected to accidental lateral loads
D) All of the above
9. If the area of tensile steel reinforcement is doubled, the moment of resistance of the beam
increases only by about
A) 12%
B) 22%
C) 32%
D) 42%
10. The neutral axis in a T-beam section falls
A) Within the flange
B) Outside the flange
C) either (a) or (b)
D) none of these
11. The width of the flange of the L-beam is taken as
A) one-sixth of the effective span of L-beam
B) Breadth of rib plus one- half of the clear distance between the rib
C) Breadth of rib plus four times the thickness of the slab
D) Minimum value of (a), (b) or (c)
12. The diameter of lateral ties, in no case, shall be less than
A) 5 mm
B) 10 mm
C) 15 mm
D) 20 mm
13. In a simply supported slab, alternate bars are curtailed at
A) one-fifth of the span
B) one-sixth of the span
C) one-seventh of the span
D) one-eighth of the span
14. A reinforced slab, built monolithically with the suppprting columns and is reinforced in two or
more directions, without any provisions of beams, called a
A) Two way slab
B) Flat slab
C) continuous slab
D) Circular slab
15. The diameter of the columns head should be taken as its diameter measured below the
underside of the slab at a distance of
A) 20 mm
B) 40 mm
C) 60 mm
D) 80 mm
16. According to Terzaghi, a foundation is said to be shallow of its depth is
A) Equal to width
B) Less than its width
C) Greater than its width
D) Either (a) and (b)
17. A footing which supports two or more columns is termed as
A) Combined footings
B) Strap footing
C) None of these
18. In the case of deformed bars, the value of bond stress for various grades of concrete is
greater by..........than the plain bars:
A) 10%
B) 20%
C) 30%
D) 40%
19. The working edge of T-square is used to
A) Draw horizontal line
B) as a base of set square
C) Draw horizontal parallel line
D) All of the above
20. Which one is not drafting equipment ?
A) Drafter
B) Dust cloth
C) scale
D) none of the above
21. To remove unnecessary lines ..........it used
A) Duster
B) Chalk
C) Sand box
D) Eraser
22. Number of equal pieces of A4 size paper from A0 is equal to
A) 2
B) 4
C) 6
D) 16
23. To measure a fraction we use
A) Diagonal scale
B) T-square
C) Set square
D) Plan meter
24. The space between two sentences should be left equal to
A) Height of letter
B) Twice the ht. of letter
C) 1.5 times ht. of letter
D) none of the above
25. Perspective projection is used to represent
A) Real exact size of object
B) Real exact shape of object
C) Natural view of the object
D) All of the above
26. Which is not pictorial projection ?
A) Oblique Projection
B) Orthographic Projection
C) Trigonometric
D) Axonometric Projection
27. In a topographic drawing the symbols representing natural features are drawn by free hand
while artificial work are drawn by
A) Free hand
B) Mechanically
C) Both (a) and (b) of the above
D) None of these
28. The technique for free hand sketch to drawing straight line is
A) Fixing Two end points
B) Fixing length of the line
C) Fixing the center of the line
D) All of the above
29. The number of years required for the net operating benefits to payback the initial cost of the
project is called
A) Operating periods
B) Service periods
C) Payback periods
D) Maintenance periods
30. The benefit cost ratio is
A) Directly Proportional to discount rate
B) Inversely proportional to discount rate
C) No any relation with discount rate
D) All of the above
31. In case of construction/production industry the cost of material is Normally
A) More than cost of labor
B) Equal to cost of labor
C) Less than cost of labor
D) None of the above
32. Find the annuity for getting 10000 at the beginning of year at a interest rate of 12% for 12
years
A) Rs. 1600
B) Rs. 1614
C) Rs. 1628
D) Rs. 1656
33. As indirect cost of project increase, the profit of project
A) increase
B) decrease
C) constant
D) all of the above
34. Break even analysis is the limited form of
A) Sensitivity analysis
B) Cost analysis
C) Benefit analysis
D) None of the Above
35. The discount rate that makes the net present value equal to zero is known as:
A) Break-even point
B) Internal rate of return
C) External rate of return
D) None of the above
36. The internal rate of return (IRR) is a rate of return used in capital budgeting to measures
and compare the.........of investments
A) Vulnerability
B) Subtract
C) Multiply
D) None of These
37. In Nepal, Which of the following act contains the provisions on health and safety of the
worker ?
A) Contract act
B) industry act
C) Labor act
D) all of the above
38. Maximum working hour for a labor per week should be
A) 42hr
B) 45hr
C) 48hr
D) 53hr
39. Ethics is the science which deals with
A) Rightness of professional
B) Wrong of professional
C) Both (a) and (b) of above
D) None of these
40. NEC act and its regulation............
A) 55 and 57
B) 54 and 55
C) 55 and 56
D) 57 and 58
41. The Number of members in dispute resolution committee is
A) 2
B) 3
C) 4
D) 5
42. The Quantity of cement concrete PCC having thickness less than 75mm is normally
measured in
A) m
B) m2
C) m3
D) lump-sump
43. The actual cost supplementary and revised estimate is
A) Less than estimated cost
B) A More than estimate cost
C) Equal to estimate cost
D) All of the Above
44. Evaluation of building is done based on
A) Detailed estimate
B) Plinth area rate
C) Cube rate
D) Depreciation method
45. The overhead and profit claimed by the contractor to client is
A) Separate item
B) Included in Materials only
C) Included in Labors only
D) Included in rate analysis
46. Full Payment of contractor is done
A) After agreement
B) After construction
C) After maintenance
D) All of the above
47. The estimated quality of cement recuired in cement mortar (1:6) per cubic meter will be
A) 5.4 bags
B) 4.8 bags
C) 8 bags
D) 3 bags
48. Which one information is not found in specification ?
A) Nature of works
B) Quantity of Materials
C) Types of Workmanship
D) Dimensions
49. In Specification of earth work in foundation trenches, drains etc, lead specified is (IS Code)
A) 30 m
B) 1.5 m
C) 50 m
D) 100 m
Answer Key :
1. C 2. B 3. D 4. A 5. A 6. B 7. C 8. D 9. B 10. C
11. D 12. A 13. C 14. B 15. B 16. D 17. A 18. B 19. D 20. D
21. D 22. D 23. D 24. B 25. C 26. C 27. B 28. A 29. C 30. B
31. A 32. B 33. B 34. B 35. C 36. D 37. C 38. C 39. C 40. A
41. B 42. B 43. A 44. B 45. D 46. C 47. A 48. D 49. A 50. C
For More Model Questions :
https://gyanmark.com/gyan-topics/civil-engineering-loksewa-preparation-for-all-level
Latest Blogs
CTEVT Scholarship Entrance Notice 2081 | CTEVT Scholarship Entrance Exam Details 2081 | CTEVT Entrance Exam 2081
4 days ago
CTEVT Entrance Questions | CTEVT Entrance Exam Model Questions | CTEVT Entrance Exam Old Questions
4 days ago
How to Check SEE Result 2080 | SEE Result 2081 Published | How to SEE SEE Result 2080 Online
1 week ago
Sahayek Suchak Exam Syllabus | Sahayek Suchak Loksewa Exam Syllabus | Anusandhan Sahayek Suchak Loksewa Syllabus
1 month ago
Sangh Computer Operator Loksewa Questions 2081 | Computer Operator Loksewa Questions 2081 | Computer Operator Level 5 Loksewa Questions 2081
1 month ago
APF Loksewa Exam Questions | Armed Police Force Exam Questions | APF ASI Loksewa Exam Questions 2081
1 month ago